Cost Estimation

The McFate Group provides estimates of increasing levels of detail at the Schematic Design phase, Design Development phase and at 50% completion of the Contract Documents.  We can begin immediately in reviewing the Program and Schematic Design

 

The McFate Group will provide estimates at major changes in systems or components and a pre-determined points in the design.  We will price options to determine if a major system change should be considered.  We can generally respond immediately with components pricing or within two weeks for a full project estimate.  We propose estimates at the following times:

1) Schematic Design Complete

Project estimate #1 at the end of schematic design.

2) Design Development Complete

Project estimate #2 at the end of design development 

Propose Value Engineering (VE) session.

3) Construction Documents Complete

Project estimate #3 at 50% CD’s.

4) Award Complete

Provide final Construction Budget upon Bid Awards to the Subcontractors.

5) Construction Completion

Budget updated on a monthly basis.

Our records concerning accuracy of design estimates and final bids is excellent.  We account for unfinished documents by carrying a design contingency in the estimates.  The design contingency reduces as more information is incorporated into the documents. We are historically 3-5% below the last project estimate.